Victoria Cross Integrated Station Development

Victoria Cross Integrated Station Development

Sydney Metro is Australia’s biggest public transport project. It will transform Sydney, delivering more trains and faster services for customers across the network. The NSW Government has awarded Lendlease the contract to deliver the new Sydney Metro Victoria Cross integrated station development in North Sydney and Lendlease has appointed SYSTRA to provide integrated Systems Engineering and Safety Assurance services.

SYSTRA will assist Lendlease in the delivery of its design milestones, and provide Systems Engineering Management, Requirements Management, Interface Management, Safety Assurance Management as well as providing expertise in specialist areas such as Systems Integration, RAM and Human Factors.

SYSTRA has developed the Station System Architecture to illustrate and communicate the complexity of the Victoria Cross integrated station development interfaces. Internal subcontractors include the Building Management Control System provider, Vertical Transport contractor and Ticketing contractor. External interfaces include the Trains, Systems, Operations, Maintenance and Line-wide contractors. Additionally, SYSTRA has developed the Master Interface Matrix and Interface Registers to manage the number of station interfaces and to ensure a holistic approach is implemented minimising technical integration risks.

In delivering Safety Assurance for the project, SYSTRA has developed the overall safety argument using Goal Structured Notation to ensure. that Lendlease meets the requirements of the Independent Safety Assessor.

SYSTRA is also leading the development and implementation of the station System Integration Functions by working alongside other stakeholders and with MTR to enable the successful station integration with the wider Sydney Metro City & Southwest network.

Top of the page

Read also

ADELAIDE HEAVY RAIL NETWORK
ADELAIDE HEAVY RAIL NETWORK
Asset Condition Assessment for the Department of Infrastructure and (...)
V/LINE PERFORMANCE MODEL
V/LINE PERFORMANCE MODEL
Operational Improvement Program with Lunarr Pty Ltd
SYSTRA Scott Lister Continues to Shine in Space
SYSTRA Scott Lister Continues to Shine in Space
Joint Project (JP) 2008 Phase 5B1 Tranche 2
Interoperability Advisor
Interoperability Advisor
SYSTRA has been engaged, as a technical advisor, to develop technical (...)
SYSTRA helps complete the NorthConnex
SYSTRA helps complete the NorthConnex
A highly publicised project in the Australian media, The NorthConnex (...)
ARTC Signalling Statement of Competency Improvement
ARTC Signalling Statement of Competency Improvement
SYSTRA has been engaged to review, develop and implement improvements to (...)
MSP - CASG Helicopter Replacement Program
MSP - CASG Helicopter Replacement Program
In mid- 2019 CASG combined the existing Army Aviation Program Office (AAPO) (...)
Digital Engineering BIM
Digital Engineering BIM
Sydney Metro is Australia’s biggest public transport project, (...)
LAND 200 MSP Project
LAND 200 MSP Project
SYSTRA (as part of the Team Downer consortium) is currently leading the (...)
Eleanor Schonell Bridge
Eleanor Schonell Bridge
The Eleanor Schonell Bridge across the Brisbane River connects Dutton Park (...)
Adelaide South Road Superway
Adelaide South Road Superway
The South Road Superway project is the South Australian’s most complex (...)
EGIP Line - Edinburgh – Glasgow
EGIP Line - Edinburgh – Glasgow
SYSTRA has been appointed to carry out OLE (Overhead Line Electrification) (...)
SYSTRA Scott Lister Level 15, Chifley Tower - 2 Chifley Square - Sydney NSW 2000 - T +61 (0) 2 9229 8100
Contact