V/LINE PERFORMANCE MODEL

Operational Improvement Program with Lunarr Pty Ltd

Between 2019 and 2020, Systra worked alongside Lunarr to develop a Performance Model, for assessing the benefits derived from asset & operational improvement initiatives on the V/Line, Victoria’s regional public transport line. This Performance Model uses asset upgrade and performance improvement inputs, to determine forecasts for enhancements in punctuality and delivery, and to measure the impact of future timetable changes. The model can also be used for assessing the impact of future levels of patronage, asset conditions, and disruptions on rail operations, and can provide an in-depth forecast of the impacts of planned improvement initiatives.

Systra utilised the modelling and data analytics expertise offered by members of the advisory team, to ensure the success of this Performance Model development. The work undertaken by Systra’s dedicated advisory team included providing advice on input data analysis and improvement, in order to assist with pinpointing the accurate locations and durations of incidents. This was achieved through the utilisation of GPS data and crosschecking of datasets. Our team also provided useful insights into the development of the base model, as well as advice on calibration, testing, and refinement, to ensure that the best quality outputs were attained. Therefore our client was able to understand the consequences of disruptive events, and could successfully develop well-informed Asset Improvement and Operational Initiative Strategies.

Top of the page

Read also

ADELAIDE HEAVY RAIL NETWORK
ADELAIDE HEAVY RAIL NETWORK
Asset Condition Assessment for the Department of Infrastructure and (...)
SYSTRA Scott Lister Continues to Shine in Space
SYSTRA Scott Lister Continues to Shine in Space
Joint Project (JP) 2008 Phase 5B1 Tranche 2
Interoperability Advisor
Interoperability Advisor
SYSTRA has been engaged, as a technical advisor, to develop technical (...)
SYSTRA helps complete the NorthConnex
SYSTRA helps complete the NorthConnex
A highly publicised project in the Australian media, The NorthConnex (...)
ARTC Signalling Statement of Competency Improvement
ARTC Signalling Statement of Competency Improvement
SYSTRA has been engaged to review, develop and implement improvements to (...)
MSP - CASG Helicopter Replacement Program
MSP - CASG Helicopter Replacement Program
In mid- 2019 CASG combined the existing Army Aviation Program Office (AAPO) (...)
Digital Engineering BIM
Digital Engineering BIM
Sydney Metro is Australia’s biggest public transport project, (...)
LAND 200 MSP Project
LAND 200 MSP Project
SYSTRA (as part of the Team Downer consortium) is currently leading the (...)
Victoria Cross Integrated Station Development
Victoria Cross Integrated Station Development
Sydney Metro is Australia’s biggest public transport project. It will (...)
Eleanor Schonell Bridge
Eleanor Schonell Bridge
The Eleanor Schonell Bridge across the Brisbane River connects Dutton Park (...)
Adelaide South Road Superway
Adelaide South Road Superway
The South Road Superway project is the South Australian’s most complex (...)
EGIP Line - Edinburgh – Glasgow
EGIP Line - Edinburgh – Glasgow
SYSTRA has been appointed to carry out OLE (Overhead Line Electrification) (...)
SYSTRA Scott Lister Level 15, Chifley Tower - 2 Chifley Square - Sydney NSW 2000 - T +61 (0) 2 9229 8100
Contact