United Arab Emirates – Dubai Tram

United Arab Emirates – Dubai Tram

SYSTRA was awarded the contract to project manage Dubai’s LRT/tram line. This line was designed to improve public transport services in Dubai’s Al Sufouh and Marina residential, tourist and business districts.

This LRT project comprised a number of challenges including the need to satisfy customer quality comfort requirements. All stations had to be air-conditioned and equipped with platform screen doors due to the city’s extreme climate.

The introduction of automatic train protection and operation (ATP/ATO) systems was also a major first. This system is compatible with manual sight-based operations thanks to Communication Based Train Control (CBTC) systems. Automatic vehicle protection (AVP) and automated platform screen door systems protect specific points (around signals, station entrances when platform screen doors are open) and supervised vehicle operation (SVO) systems help drivers to align their tram doors with station platform screen doors. Lastly, it’s also the first LRT/tram line in the world to be entirely powered by a ground level third conductor rail.

Inaugurated on November 11th, 2014, this is the United Arab Emirate’s first LRT/tram line. Spanning a total of 9.5 km, it runs from Al Sufouh to Dubai’s Marina and has 11 stations. It also connects to the Dubai monorail and metro network. Work has already started on a second phase to extend the line by a further 4.5 km.

SYSTRA’S Role:

SYSTRA started work on the transportation programme for the Al Sufouh district in 2005 at the request of Dubai’s Roads and Transport Authority (RTA). Then, in 2006, the Group was asked to:

  • Produce a feasibility study
  • Compile basic designs
  • Design documents for the call to tender
  • Evaluate tender bids

In 2008, SYSTRA won the project management contract, which covered:

  • Design verification
  • Works supervision
  • Systems integration

Although the project was put on hold between 2010 and 2011, the line went on to be commissioned on November 11th 2014. SYSTRA then provided assistance during the warranty period to:

  • Check that RAMS (Reliability, Accessibility, Maintainability and Safety) performance was in accordance with contractual requirements
  • Help analyse and resolve flaws,
  • Manage technical and business completion activities.

According to SYSTRA’s project manager and RTA representative, "SYSTRA has a unique understanding of contracting authority and operator considerations. It also successfully met every project objective – to create a safe and reliable transport system using the latest technology to optimise lifecycle costs.

Top of the page

Read also

Eleanor Schonell Bridge
Eleanor Schonell Bridge
The Eleanor Schonell Bridge across the Brisbane River connects Dutton Park (...)
Adelaide South Road Superway
Adelaide South Road Superway
The South Road Superway project is the South Australian’s most complex (...)
Casablanca LRT – Line 1
Casablanca LRT – Line 1
SYSTRA was awarded the contract to manage the entire project to build Line (...)
Bordeaux LRT – Lines A, B & C
Bordeaux LRT – Lines A, B & C
SYSTRA was appointed to project manage the first phase of construction of (...)
Washington D.C. – Modernization of Union Station
Washington D.C. – Modernization of Union Station
SYSTRA produced plans to redevelop and modernize the main concourse at (...)
EGIP Line - Edinburgh – Glasgow
EGIP Line - Edinburgh – Glasgow
SYSTRA has been appointed to carry out OLE (Overhead Line Electrification) (...)
Grand Paris metro – Line 15 south
Grand Paris metro – Line 15 south
The new Grand Paris metro network will provide outlying districts with (...)
Dubai MRT – Red and Green Lines
Dubai MRT – Red and Green Lines
As the project manager in charge of building two MRT lines, SYSTRA worked (...)
Malaysia – Kuala-Lumpur LRT3
Malaysia – Kuala-Lumpur LRT3
SYSTRA won the contract to produce preliminary designs for the third LRT (...)
New York City Transit – CBTC upgrade
New York City Transit – CBTC upgrade
SYSTRA is working on the programme to modernise the New York City Transit (...)
Crossrail -London
Crossrail -London
SYSTRA are part of the team with Bechtel and CH2M serving as Crossrail’s (...)
Hanoi Metro Line 3
Hanoi Metro Line 3
SYSTRA worked as General Consultant on Line 3 of the Hanoi metro.
SYSTRA Scott Lister Level 15, Chifley Tower - 2 Chifley Square - Sydney NSW 2000 - T +61 (0) 2 9229 8100
Contact