Malaysia – Kuala-Lumpur LRT3

Malaysia – Kuala-Lumpur LRT3

SYSTRA won the contract to produce preliminary designs for the third LRT line in Kuala-Lumpur, Malaysia. SYSTRA was selected for its expertise in developing solutions involving U-shaped viaducts.

This 37.7 km line, which comprises 26 stations, a 35 km viaduct and 2 km underground section, will run between the district of Bandar Utama and Johan Setia to the west of Kuala-Lumpur. Ten of the stations will be equipped with park and ride facilities for 6 000 cars.

This third LRT line should help increase the public transport share of the transport mix from 20% to 40% in accordance with the new transport master plan.

SYSTRA’s Role:

As project manager, SYSTRA will produce preliminary designs. These will cover:

  • Civil engineering structures
  • U-shaped viaduct
  • Underground section
  • Maintenance and storage facility
  • All railway systems
  • Operating plans
  • Rolling stock
  • All interfaces

SYSTRA will also act as consultant to the local contractors in charge of producing detailed designs.