Major Capital Project Gateway Review

Major Capital Project Gateway Review

Rio Tinto required a gateway review of a proposed new mine development with associated rail infrastructure

SYSTRA Scott Lister was engaged to provide rail expertise for a gateway review of a proposed major capital project; the construction of a major new mine with major rail infrastructure. Providing inputs and recommendations in relating to schedule, readiness, technical and delivery risks and opportunities to maximise project benefits.

SYSTRA produced an independent report on completion that enabled the Client’s strategic decision making.

The project required analysis of:

  • Rail system design
  • Critical path
  • TILOS program
  • Logistics planning
  • Resourcing
  • Material supply
  • Budget
  • Approvals
Top of the page

Read also

ADELAIDE HEAVY RAIL NETWORK
ADELAIDE HEAVY RAIL NETWORK
Asset Condition Assessment for the Department of Infrastructure and (...)
V/LINE PERFORMANCE MODEL
V/LINE PERFORMANCE MODEL
Operational Improvement Program with Lunarr Pty Ltd
SYSTRA Scott Lister Continues to Shine in Space
SYSTRA Scott Lister Continues to Shine in Space
Joint Project (JP) 2008 Phase 5B1 Tranche 2
Interoperability Advisor
Interoperability Advisor
SYSTRA has been engaged, as a technical advisor, to develop technical (...)
SYSTRA helps complete the NorthConnex
SYSTRA helps complete the NorthConnex
A highly publicised project in the Australian media, The NorthConnex (...)
ARTC Signalling Statement of Competency Improvement
ARTC Signalling Statement of Competency Improvement
SYSTRA has been engaged to review, develop and implement improvements to (...)
MSP - CASG Helicopter Replacement Program
MSP - CASG Helicopter Replacement Program
In mid- 2019 CASG combined the existing Army Aviation Program Office (AAPO) (...)
Digital Engineering BIM
Digital Engineering BIM
Sydney Metro is Australia’s biggest public transport project, (...)
LAND 200 MSP Project
LAND 200 MSP Project
SYSTRA (as part of the Team Downer consortium) is currently leading the (...)
Victoria Cross Integrated Station Development
Victoria Cross Integrated Station Development
Sydney Metro is Australia’s biggest public transport project. It will (...)
Eleanor Schonell Bridge
Eleanor Schonell Bridge
The Eleanor Schonell Bridge across the Brisbane River connects Dutton Park (...)
Adelaide South Road Superway
Adelaide South Road Superway
The South Road Superway project is the South Australian’s most complex (...)
SYSTRA Scott Lister Level 15, Chifley Tower - 2 Chifley Square - Sydney NSW 2000 - T +61 (0) 2 9229 8100
Contact