Hanoi Metro Line 3

Hanoi Metro Line 3

SYSTRA worked as General Consultant on Line 3 of the Hanoi metro.

The stations were designed to be environmentally friendly with a contemporary feel. The butterfly wing shaped glass and metal roofs are a contemporary interpretation of Vietnam’s vernacular overhanging roofs.

Cladding for the façades will be of stainless steel, glass and vegetation.

Since November 2007, SYSTRA has been acting as General Consultant to the Hanoi Metropolitan Rail Transport Project Board (HRB) and managing the project on behalf of the Hanoi People’s Committee (HPC).

As such, SYSTRA is responsible for all design studies for the project as well as preparation of tender documents including assistance for bids review and contracts awarding. SYSTRA also helps the client with financial management of the project and will be responsible for supervision of works during
the construction and installation phase.
Finally, prior to commissioning and launch, SYSTRA will provide training on operation and maintenance.
SYSTRA has set up a project office in Hanoi with dozens of Vietnamese and French personnel. The team is in charge of all aspects of the project: coordination with the client and the authorities, managing the design phase for designs from head office, drawing up and revising technical documents, translations…

Top of the page

Read also

Eleanor Schonell Bridge
Eleanor Schonell Bridge
The Eleanor Schonell Bridge across the Brisbane River connects Dutton Park (...)
Adelaide South Road Superway
Adelaide South Road Superway
The South Road Superway project is the South Australian’s most complex (...)
Casablanca LRT – Line 1
Casablanca LRT – Line 1
SYSTRA was awarded the contract to manage the entire project to build Line (...)
United Arab Emirates – Dubai Tram
United Arab Emirates – Dubai Tram
SYSTRA was awarded the contract to project manage Dubai’s LRT/tram line. (...)
Bordeaux LRT – Lines A, B & C
Bordeaux LRT – Lines A, B & C
SYSTRA was appointed to project manage the first phase of construction of (...)
Washington D.C. – Modernization of Union Station
Washington D.C. – Modernization of Union Station
SYSTRA produced plans to redevelop and modernize the main concourse at (...)
EGIP Line - Edinburgh – Glasgow
EGIP Line - Edinburgh – Glasgow
SYSTRA has been appointed to carry out OLE (Overhead Line Electrification) (...)
Grand Paris metro – Line 15 south
Grand Paris metro – Line 15 south
The new Grand Paris metro network will provide outlying districts with (...)
Dubai MRT – Red and Green Lines
Dubai MRT – Red and Green Lines
As the project manager in charge of building two MRT lines, SYSTRA worked (...)
Malaysia – Kuala-Lumpur LRT3
Malaysia – Kuala-Lumpur LRT3
SYSTRA won the contract to produce preliminary designs for the third LRT (...)
New York City Transit – CBTC upgrade
New York City Transit – CBTC upgrade
SYSTRA is working on the programme to modernise the New York City Transit (...)
Crossrail -London
Crossrail -London
SYSTRA are part of the team with Bechtel and CH2M serving as Crossrail’s (...)
SYSTRA Scott Lister Level 15, Chifley Tower - 2 Chifley Square - Sydney NSW 2000 - T +61 (0) 2 9229 8100
Contact