AIR5431 Phase 2&3 Air Traffic Management Voice Communication Systems Engineering & Integration

AIR5431 Phase 2&3 Air Traffic Management Voice Communication Systems Engineering & Integration

SYSTRA Scott Lister provided installation deployment execution strategies for operational ATM sites.

The solution design needed to take into account Safety critical operational ATM systems which needed to be protected during implementation to support ATM service interruption. The program required a high level of Human Factors Integration to take into account Air Traffic Control workstation designs.

SYSTRA Scott Lister’s role
We were engaged to deliver all VOIP Communications Systems installation infrastructure design deliverables throughout the design phases for Airservices Australia Air Traffic Management (ATM) facilities across Australia including Melbourne, Sydney, Brisbane and Perth.

We provided all elements of the fixed price work package for the Safety critical ATM VOIP communications solution including Project Management, Systems Engineering & Integration, Hardware design & integration and deployment management planning required to support design package.

Top of the page

Read also

ADELAIDE HEAVY RAIL NETWORK
ADELAIDE HEAVY RAIL NETWORK
Asset Condition Assessment for the Department of Infrastructure and (...)
V/LINE PERFORMANCE MODEL
V/LINE PERFORMANCE MODEL
Operational Improvement Program with Lunarr Pty Ltd
SYSTRA Scott Lister Continues to Shine in Space
SYSTRA Scott Lister Continues to Shine in Space
Joint Project (JP) 2008 Phase 5B1 Tranche 2
Interoperability Advisor
Interoperability Advisor
SYSTRA has been engaged, as a technical advisor, to develop technical (...)
SYSTRA helps complete the NorthConnex
SYSTRA helps complete the NorthConnex
A highly publicised project in the Australian media, The NorthConnex (...)
ARTC Signalling Statement of Competency Improvement
ARTC Signalling Statement of Competency Improvement
SYSTRA has been engaged to review, develop and implement improvements to (...)
MSP - CASG Helicopter Replacement Program
MSP - CASG Helicopter Replacement Program
In mid- 2019 CASG combined the existing Army Aviation Program Office (AAPO) (...)
Digital Engineering BIM
Digital Engineering BIM
Sydney Metro is Australia’s biggest public transport project, (...)
LAND 200 MSP Project
LAND 200 MSP Project
SYSTRA (as part of the Team Downer consortium) is currently leading the (...)
Victoria Cross Integrated Station Development
Victoria Cross Integrated Station Development
Sydney Metro is Australia’s biggest public transport project. It will (...)
Eleanor Schonell Bridge
Eleanor Schonell Bridge
The Eleanor Schonell Bridge across the Brisbane River connects Dutton Park (...)
Adelaide South Road Superway
Adelaide South Road Superway
The South Road Superway project is the South Australian’s most complex (...)
SYSTRA Scott Lister Level 15, Chifley Tower - 2 Chifley Square - Sydney NSW 2000 - T +61 (0) 2 9229 8100
Contact